The client requested an inspection of the toilets and any other necessary repairs in the home. Our plumbing technician removed the old toilet and low-installed flange in the hallway bathroom, replacing it with a new flange set at the correct height. One of the two toilets was installed. The master bathroom floor will need to be fixed before a new flange and toilet can be set. Additionally, the water lines running to the master bathroom shower were cut and capped.
Toilet and Shower Line Repairs
Ryan G.
Before You Go!
Last Chance to Take Advantage of Our 0% Financing
Say yes to our 0% financing offer and enjoy the freedom to pay for your purchase over time without worrying about added interest charges.
Exclusions apply. See us for details.